Building Regulations Approved Document Part M in a Nutshell

News
Image of Building Regulations Approved Document M front page

Changes in 2015 to the Building Regulations Approved Document Part M, which contains guidance on access, introduced some new standards for new-build dwellings. The base standard is fairly similar to the old Part M; M4(2) is a higher standard that designs new dwellings so that they're more easily accessed and adapted should the need arise in future; M4(3) is fully wheelchair adaptable or accessible. The local planning authority will determine what standard of accessibility is required for each development as a condition of the planning permission.

If a local planning authority introduces one of these optional standards, you, as the developer, must inform building control that you’ll be meeting the higher level of requirements.

To help you plan and budget, here’s a simple roundup of the main differences between M4(1) (the basic standard) and M4(2) (the intermediate standard):

External differences

  • All external doors must have a level threshold - the lower standard is just one door
  • Approach routes must have a minimum clear width of 900mm or 750mm where there are obstructions, the gradient should be between 1:20 and 1:12
  • Every gateway must have an 850mm clear opening, with a 300mm nib on the leading edge to allow users to reach the handle
  • Parking spaces within the private curtilage of the dwelling (but not a car port or garage) must include at least one standard parking bay that can be widened at a later date to 3.3m
  • Every principal entrance must have a cover(canopy, overhang or recess for example) with minimum width of 1200mm and depth of 900mm for communal entrances or a width of 900mm and depth of 600mm for private entrances. This can’t be a porch
  • External doors must have an openable width of 850mm and have a 300mm nib on the leading edge (see diagram 2.2 ADM)

Internal differences

  • Stairs must be a minimum width of 850mm to allow the future installation of a stair lift
  • At least one bedroom must have a 750mm clear access zone from the foot of the bed and on both sides. Every other double bedroom will need a clear access zone on one side and the foot of the bed. Plans of furniture layouts in this case will need to be provided to show compliance (See diagram 2.4 ADM)
  • All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2 
  • A bathroom must be located on every floor that has a bedroom
  • Ground floor WC must have a hidden drainage connection and be large enough to accommodate a shower (see diagram 2.6 ADM)
  • Consumer units must be mounted at a height between 1350mm and 1450mm above floor level
  • Handles for windows, unless on a remote opening system, must be located between 450mm and 1400mm above floor level

There are lots of other new details to think about, so talk to your local authority building control team as early as possible to ensure your design will comply.

Find your local building control team

Further reading

Building Regulations Approved Document M (Dwellings)

 

Please Note: Every care was taken to ensure the information was correct at the time of publication. Any written guidance provided does not replace the user’s professional judgement. It is the responsibility of the dutyholder or person carrying out the work to ensure compliance with relevant building regulations or applicable technical standards.

 


This article was checked and updated on 18th March 2022

Comments

M4(2) gas meter shut off valve

Submitted 1 year 4 months ago

In houses, where it is the only way of isolating the supply, would the shut of valve at the gas meter need to be within the 450mm-1200mm height range described under switches, sockets, stop cocks & controls?

LABC Response

Submitted 1 year 3 months ago

Hi,

Thank you for your enquiry.

Part M refers in this context to BS8300 – 2:2018: Meters should be mounted between 1200mm and 1400mm from the floor so that the readings can be viewed by a person standing or sitting. Pre-pay meters should be accessible but protected from tampering by children.

Best,
LABC Team

M4(2) Level Access Shower

Submitted 1 year 4 months ago

in 1 & 2 bed houses, what measures would be required to satisfy the requirement to 'provide provision for potential level access shower in the bathroom? Many bath wastes connect to a stack above floor level, hence wouldn't allow a level access tray to be fitted without first lifting the floor and making a new connection to the stack.

LABC Response

Submitted 1 year 3 months ago

Hi,

Thank you for your enquiry.

LABC are unable to specify solutions for building regulation compliance. However, you may find the frequently asked questions on the government website to be helpful. The response for adaptable to accessible layouts on page 19 would suggest that modifying soil stacks is not considered as a reasonably simple alteration. From this, you may need to reconsider the suitability of an above floor bath waste connection into the soil stack.

Best,
LABC Team

Part m access

Submitted 1 year 3 months ago

6 metres approach, 550mm drop. How do I meet with part m approach?

LABC Response

Submitted 1 year 2 months ago

Hi,

Thank you for your enquiry.

Unfortunately, LABC is unable to assist on this matter as there is insufficient detail in the question (such as does it relate to a new build/change of use/existing building, dwelling/building other than dwelling, etc) to signpost you to the most appropriate guidance within Approved Document M. If the query relates to a current project, we advise consulting with the designer and/or Building Control Body overseeing the works.

Kind regards,
LABC

Level Access from front door

Submitted 1 year 1 month ago

Hi
I have just completed a new build house and my building controller says i need level access from the front door. I had planning granted in June 2018 and started developing in May 2021. Nothing in the planning approval mentions level access. Is my building controller incorrect?

LABC Response

Submitted 1 year 1 month ago

Hi,

Thank you for your enquiry, however, the answer will be dependent upon your particular circumstances, and this is not something that LABC can help with.
Please discuss the details of your proposals with your professional advisors and contact the Building Control team at your Local Authority to discuss project specific requirements.
We are sorry we cannot be of further assistance.

Best,
LABC Team

Door Viewer

Submitted 9 months 1 week ago

To comply with M43 regs do you have to install two eye viewers thanks

LABC Response

Submitted 9 months ago

LABC is not able to comment on specific projects, however in general terms for M4 (3) any door entry controls, where provided, are mounted 900-1000mm above finished ground level and a minimum of 300mm away from any external return corner.
If the query relates to a current project we advise consulting with the building control body overseeing the works.

Many thanks,
LABC Team

Ychwanegu sylw newydd

This question is for testing whether or not you are a human visitor and to prevent automated spam submissions.

Sign up to the building bulletin newsletter

Over 48,000 construction professionals have already signed up for the LABC Building Bulletin.



Join them and receive useful tips, practical technical information and industry news by email once every 6 weeks.



Subscribe to the Building Bulletin