Advice for construction professionals and building owners on High Pressure Laminate (HPL) panel systems issues

News
photo of building

Recent advice from the Independent Expert Advisory Panel, set up by the government in the wake of the Grenfell Tower fire, notes that the risk of unsafe HPL cladding systems on residential buildings of 18m or more, is not as high as the risk of unsafe ACM Category 3 panel systems (ACM with unmodified polyethylene filler).

Priority should be given to the removal of systems using ACM Category 3 panels, however, this should be followed by immediate action to remediate unsafe HPL cladding systems. This should be carried out as soon as possible. 

Alongside the government’s investigations and advice regarding aluminium composite material (ACM) panels there has been ongoing research and testing of non-ACM cladding systems when subjected to fire. The Building Research Establishment has been commissioned to carry out the testing programme and this is expected to conclude this summer.

Following advice from MHCLG’s Independent Expert Advisory Panel, the government commissioned a large-scale test on an HPL panel system, which was carried out by the Fire Protection Association on 11 July 2019. Subsequently, Advice Note 22 was issued on 18 July 2019. 

A system composed of HPL panels with fire retardant Class B-s1, d0 together with stone wool insulation was tested in accordance with BS 8414 and achieved a BR 135 classification. See more from the report.

It is important to note that although this HPL system achieved the necessary performance criteria, and could be safe on existing buildings, the safety of this system, as with any other cladding system, is dependent on its fitting.

The Expert Panel also stresses that HPL panels with a European classification of Class C or D, and cladding systems comprising HPL panels of any classification when used in combination with combustible insulation are very unlikely to adequately resist the spread of fire. Building owners with these types of HPL cladding systems should take immediate action in line with MHCLG Advice Note 14.

Information on the type of cladding used on a building may be found on as-built drawings, in the Operation and Maintenance manual, or in the package of fire safety information issued in line with Regulation 38. Building owners may also wish to confirm that their buildings have not been made unsafe through material substitutions during construction or later alterations, this may require material testing which should be carried out by a UKAS accredited laboratory.

Further information

Advice Note 22 - Use of High Pressure Laminate Panels in external wall systems

MHCLG Customer Classification Report

Advice Note 14 - Advice on external wall systems that do not incorporate Aluminium Composite Material

 

Please Note: Every care was taken to ensure the information was correct at the time of publication. Any written guidance provided does not replace the user’s professional judgement. It is the responsibility of the dutyholder or person carrying out the work to ensure compliance with relevant building regulations or applicable technical standards.

Comments

Ychwanegu sylw newydd

This question is for testing whether or not you are a human visitor and to prevent automated spam submissions.

Sign up to the building bulletin newsletter

Over 48,000 construction professionals have already signed up for the LABC Building Bulletin.



Join them and receive useful tips, practical technical information and industry news by email once every 6 weeks.