LABC News

Blog Post
Cold weather can affect the behaviour of materials such as concrete. Understand the characteristics of what you’re dealing with and take regular…
Blog Post
The fire stop should achieve the required fire resistance and include a cavity tray (where required) and weep holes above. The minimum projection of…
Blog Post
Where more than 50% of the surface of an existing roof is re-covered, a Building Regulations application must be made - and the Regs require the roof…
Blog Post
Building Regulations Approved Document C recommends using BS 8102 to design basements where walls and floors are subject to water pressure. Three…
Blog Post
This Detail is in the vertical masonry that passes between dwellings. It’s a requirement to fire stop any cavity where it is not fully filled. The…
Press Release
Attracting new blood to public sector building control remains an urgent issue as the effects of a demographic time bomb hit, incoming LABC President…
Blog Post
If you’re working on an extension and you find something like the above, you’ll need to put it right. What’s the problem? Using a ‘P’ trap at the…
News
Some cable manufacturers are producing ‘golden samples’ to cheat the system and get dodgy cables onto the market. A Chinese cable manufacturer has…
Blog Post
The above photograph was taken by one of our building control surveyors carrying out a site inspection, and shows how attention to detail (or a lack…