How to avoid defects claims on flat roofs

Blog Post
Picture of a flat roof

Flat roofs are a common feature often found on domestic extensions, loft conversions, garages, porches, balconies and in some cases the main roof of a dwelling. They are more accessible, quicker to install and absorb sunlight at a higher rate than slated roofs, helping to keep the interior warmer.

There are two main types of flat roof; Warm deck, where the insulation is placed above the roof deck but below the weatherproofing; and Cold deck, where the insulation is placed between the flat roof joists at ceiling level. There are many types of covering including felt, single ply, rubber and GRP, all of which have specific installation requirements.

However, flat roofs are not without their issues, the most common being water leakage due to standing water on the flat surface; thermal movement due to thawing and cooling; condensation problems due to poorly detailed insulation and ventilation; and roof membrane detachment due to trapped moisture and flashing defects resulting from poor installation or damage.

How to avoid issues with flat roofs

  • All roofs should be insulated - the type of insulant used and whether you're constructing a cold or warm roof will determine the thickness of insulation. Refer to insulation manufacturers’ details to meet the maximum ‘U’ values of 0.18 in England and 0.15 in Wales.
  • In both cold and warm deck roofs, the external wall insulation needs to be extended up to the underside of the roof insulation to prevent cold bridging
  • In cold deck roofs, where the insulation is placed at ceiling level, a minimum of 50mm gap should be provided for ventilation above insulation to prevent condensation forming. Ensure the roof has ventilation openings of at least equal to a 25mm continuous gap running the full length of the eaves on two opposite sides
  • A vapour barrier should be placed on the warm side of the insulation, i.e. between the insulation and the ceiling finish
  • Don’t make it too flat - ensure there’s a small slope for effective drainage to prevent standing water, which will lead to water leakage. BS 6229 recommends that a flat roof should have a minimum design fall of 1:40.
  • Anchor the flat roof to the wall to prevent uplift and ensure all flashing over joints are robustly fitted to prevent water seeping in and causing damage
  • Ensure the roof covering has the correct fire rating – roofs within 6m of a boundary should be AA, AB or AC fire-rated (or European class B-RoofT4)
  • All materials should be suitable for use in flat roofs - they should be able to handle repeated cycles of heating and cooling, which cause expansion and contraction, leading to cracking and water penetration. The roofing product should have appropriate third-party certification or CE-marking that meets Regulation 7
  • Ensure that upstands and flashings are suitable for the roof covering, a minimum 150mm upstand is usually required. Drainage outlet positions are also critical to avoid ponding.
  • Use the right expertise - many flat roofs fail prematurely due to poor workmanship

According to LABC Warranty, flat roofing usually fails because of poor design and workmanship. Chapter 7 of The LABC Warranty Technical Manual has substantial guidance on continuous membrane roofing, green roofing and balconies. Leading warranty providers including LABC Warranty welcome the changes as defined in BS5534. Early dialogue with your warranty risk management surveyor is strongly advised in order to determine what requirements apply to the roof.

Please Note: Every care was taken to ensure the information was correct at the time of publication. Any written guidance provided does not replace the user’s professional judgement. It is the responsibility of the dutyholder or person carrying out the work to ensure compliance with relevant building regulations or applicable technical standards.

Comments

Question

Submitted 6 years 2 months ago

"In both cold and warm deck roofs, the external wall insulation needs to be extended up to the underside of the roof insulation to prevent cold bridging" Shouldn't this be the top side of the flat roof insulation, otherwise there will be cold bridging at the corner to corner junction?

Reply

Submitted 6 years 2 months ago

It would depend on the relative positions of the insulation. Usually the flat roof insulation will oversail the wall insulation, so the wall insulation will be continued up to the underside of it as per the article. In some instances it may be that the wall insulation will carry up past the roof insulation, then as you correctly state it should continue to the top edge. The key thing is continuity and full overlap of the insulation materials.

Kind Regards,

LABC

Depth

Submitted 6 years 2 months ago

Would 50mm of PIR insulation above the deck and 100mm of PIR insulation between the joists, but tightly abutting the underside of the 50mm above, still be considered a warm deck and then not need ventilation?

Webmaster note

Submitted 6 years 2 months ago

All comments posted at an earlier date to this one have been transferred from our old website.

(No subject)

Submitted 1 year 5 months ago

Are there building regs concerning aesthetic overhangs on flat roofs? I.e. a 50cm overhang with soffit lights. Are there wind uplift factors to take into account?

LABC Response

Submitted 1 year 5 months ago

Hi,

Thank you for your query.

Consideration of wind uplift for a flat roof will be required irrespective of the presence of a soffit overhang.

Best,
LABC Team

flat roof felt

Submitted 1 year 5 months ago

My roof leaked due to poor workmanship and inferior materials used by their contractors when they refit my roof as part of a subsidence claim. They took issue with the fact that I supplied proof that the roof was felt before their cowboys laid down single ply rubber (poorly) and argued that as it was once 2 ply felt and the quote for replacelmnet I supplied is for 3 layers of felt. What do the regulations say about the layers of felt that now must be used?

LABC response

Submitted 1 year 4 months ago

Hi,

Thankyou for your enquiry, the building regulations refer to Approved document C and provides that roofs (resistance to moisture from the outside) Roofing can be designed to protect a building from precipitation either by holding the precipitation at the face of the roof or by stopping it from penetrating beyond the back of the roofing system. Any roof will meet the requirement if:
a. it is jointless or has sealed joints, and is impervious to moisture (so that moisture will not enter the roofing system); or
b. it has overlapping dry joints, is impervious or weather resisting, and is backed by a material which will direct precipitation which enters the roof towards the outer face (as with roofing felt).

In your specific case we would advise that the specification for the product should be assessed to confirm that it complies with the guidance in approved document C.

We would also point out that if the area of replacement of the roof covering was more that 50% of the roof area than an application should have been made to the LA in terms of a thermal upgrade and other relevant parts of the regulations because of the new material applied.

Best,
LABC team

warm roof

Submitted 1 year ago

Would 50mm of PIR insulation above the deck on vapour barrier and 100mm of PIR insulation between the joists, but tightly abutting the underside of the 50mm above, still be considered a warm deck and then not need ventilation?

LABC Response

Submitted 11 months 4 weeks ago

Thank you for your recent on-line enquiry.

LABC is a membership organisation, providing advice and support to its member local authorities around England and Wales. As a result, LABC cannot comment on the application and enforcement of the Building Regulations on individual cases, as this is a matter for the local council – being the enforcing authority for building regulations.

In the opinion of LABC, the design of the roof you have outlined would not be classed as a ‘warm roof’. It is probably more akin to a ‘hybrid roof’. BS 6229 and BS 5205 state that there is an increased risk of interstitial condensation with a hybrid roof and therefore it is recommended that a full condensation risk analysis is carried out.

In light of the above, LABC would recommend you discuss the detail with a suitably competent building professional, along with ensuring that the PIR insulation materials are specified in accordance with the manufacturer’s details and any relevant third-party accreditation.

Kind regards,
LABC Team

Add new comment

This question is for testing whether or not you are a human visitor and to prevent automated spam submissions.

Sign up to the building bulletin newsletter

Over 48,000 construction professionals have already signed up for the LABC Building Bulletin.



Join them and receive useful tips, practical technical information and industry news by email once every 6 weeks.



Subscribe to the Building Bulletin