Hotels and leisure
Our network of around 3,800 surveyors have the local experience and necessary expertise to deal with any project, be they hotels, leisure centres or sports club facilities.
Read our case study for Butlin’s, Wave Hotel, Bognor Regis, Sussex.
Located in the green belt on the edge of a country park, the centre explores and celebrates industrial, cultural and natural heritage of the Derwent Valley and surrounding area.
The combination of man-made reclaimed ground and surface flood risk created a particular challenge in relation to the below ground work.
Building control team: Gateshead Council
The hotel's contemporary design represents a landmark building for the regeneration of the Eastover district of Bridgwater Town in the Sedgemoor District Council.
The introduction of Marco Pierre Whites' Steakhouse destination restaurant offers a dining experience for hotel guests and the local community and it has proven to be exceptionally popular.
Building control team: Somerset Building Control Partnership
This RSC theatre on the banks of the River Avon was completely refurbished and relaunched as "The Other Place".
This £112m project required the wealth of knowledge and experience relating to theatre design that the council could provide.
Building control team: Stratford-upon-Avon
Willmott Dixon are bringing this Victorian architectural gem back to life, with the help of the building control team at Haringey Council.
Works being carried out at the iconic North London venue include the restoration of the East Wing, a 1,300 seat theatre, the creation of a "birthplace of tv" experience.
Building control team: Haringey Council
Use this search to get the direct contact details for your local team.
The £13.4 million redevelopment of the existing arena site enabled Rushcliffe Borough Council to create a modern new civic and leisure centre.
The building control team's help with fire and safety considerations was invaluable in creating a fire strategy at design stage.
Building control team: East Midlands Building Consultancy
A large leisure centre which replaced a 1970s sports centre on the same site.
With a design that incorporated a striking aluminium and copper facade, the building is as inclusive and energy efficient as possible, with a BREEAM Excellent rating achieved.
Building control team: Acivico
Partial demolition and refurbishment of the existing Grade II building and new entrance lobby, education centre and alterations.
Emergency lighting and sprinkler system improvements were made, and new pressurised areas installed to allow the safe exit of disabled visitors.
Building control team: Lambeth Council
For more information on any of the above please contact our Director of Regulatory Policy Martin Taylor by emailing martin.taylor@labc.co.uk.
If you're a professional in the construction industry, sign up to our free Standards Hub to receive exclusive curated content such as: briefings and reports, analysis on standards issues, CPD opportunities plus more.
* Planning & building consent
* Structural warranties
* Acoustics and air pressure tests